For this past week, everything got done that I had hoped to, with the exception of attaching the wires to the boards that I wanted to. The assembly of the voltage and USB boards went pretty smoothly, but the Wii trims were more of an issue. By the end of the week I was able to get the Wii boards all modified and prepped for trimming, so no more Wiis will be needed for this run. For this week, the plan is to test everything that was assembled last week. By the end of this week all Wiis and boards should be completely ready to go, with the only work left before assembly being attaching wires to boards.